DRAG

Get In Touch

img

789 Inner Lane, Holy park,

California, USA

BOONE ELEMENTARY INSTALL

Connecting a Campus: HDD Fiber Install, Dallas

CJB Construction is installing new fiber to the elementary school using horizontal
directional drilling (HDD). This trenchless approach lets us cross drive lanes, sidewalks,
and landscaped areas without open cuts—keeping the campus safe and daily operations moving.

Our team verified existing utilities, coordinated permits and traffic control, and scheduled
work to minimize disruption during arrival and dismissal windows. We match the bore path and
tooling to site conditions, then restore cleanly and deliver inspection-ready closeout
documentation.

  • Service Category: Fiber
  • Client: Gigabit
  • Project Date: August 2025
  • Location: Dallas, Texas


HDD rig installing fiber conduit to elementary school in Dallas

Service Benefits:

HDD provides a safer, faster way to bring fiber to active campuses—less surface disruption,
fewer closures, and a cleaner finish. Our school-site procedures keep students, staff, and
neighbors protected while we deliver reliable connectivity.

  • Verified locates & hydrovac daylighting to prevent strikes
  • Trenchless bores under drives & sidewalks—minimal disruption
  • Conduit, pull tape & markers installed to spec; separations maintained
  • Clean restoration and traffic/pedestrian control suited for schools
  • Inspection-ready closeout: photos, redlines/as-builts & test records